page_head_bg

News

THE PRODUCT STORY OF KAIYUAN

In 2011, our company undertook the construction project of the Leshan Angu Hydropower Station on the Dadu River. The tailwater channel of the power station needs to dig millions of cubic meters of red sandstone with a hardness of grade 5 on the riverbed. The project cannot be blasted, and the speed, quantity and cost of the breaker are immeasurable.
398743623e8bb31dd4cae07b4ac2358
e1995c895bdcb7e5914f2fae82d9a99

The Carter D11 super-large bulldozer that was initially deployed has achieved initial results, but the endless new problems make it difficult to deal with. First, the capital pressure of investing in multiple bulldozers is too great. Second, the digging depth of the bulldozer is not enough and the bottom is uneven, which leads to slow loading and slow driving of the material transport vehicle, as well as slow response of the bulldozer and high failure rate.

The rock arm came into being in the research and development of Kaiyuan Zhichuang to quickly solve the construction period. Since 2011, Kaiyuan Zhichuang has continuously carried out technological innovation and product upgrades from the initial rock arm, and gradually developed the current diamond arm. Thirteen years of hard work have made Kaiyuan Zhichuang one of the leaders in the industry.

2020

Post time: Jun-14-2024

Leave Your Message:

Write your message here and send it to us.